Step 8: Strip off a few inches of the grey covering for each light so that the 2 wires are well free and clear of each other. Then strip off 1/2 inch from each wires coating in prep for your connnections.
Step 9: With a few turns, twist together all white wires and then all red wires for the lights as shown. These wires will be further twisted once you install the marrets so be careful not to over twist them. 2 or 3 turns should be fine for now just so they are held together.
Step 10: Cut and bare your main feed / power wire from both directions. These wires should be stripped in the same manner as you did in step 8. Again, strip off approx. 1/2 inch of the coating for each. Now twist the white LED wires a few turns around the main feed white. Do the same for the reds to the main feed black wire. Hold the other main feed wire right next to this bundle, sleeve the marret down and twist until the connection is snug tight. White main feed to white and black main feed to red.
Step 11: The circut connections for this section of lights should now be complete and secure. Continue this same procedure for all lights for each panel of glass or pickets.

Go to: Page 1 I Page 2 I Page 3 I Page 4

Return to Installation Guide - Main Menu


Advanced Aluminum Railings & Design Inc., www.dekrail.ca
Tel: 604-291-6024 or Toll Free: 1-888-DEK-RAIL (335-7245) Fax: 604-291-6052
B3-5279 Still Creek Avenue, Burnaby, British Columbia, Canada, V5C 5V1