SDek Rail - Built-in LED lighting installation Page 1
Step 1: To install 3 led lights for each panel of glass or pickets, measure the panels width from post to post and divide by 2. This will be your center light location. Then measure from each post to the center light and divide by 2 again. These will be your other light locations. If your span is only using 2 lights, divide the full span by 3. As an example, a 48 inch post to post span means your light locations will be at 16 inches from each post - with 16 inches between the two lights. Using a 1/4 inch drill bit, drill out your light holes along the outside line groove in the anchor rail. The outside line groove is the one closest to the deck.
Close-up showing hole as drilled in Step 1.
Step 2: Use a circular file and take care to remove any metal burs that may be present on the underside of the anchor rail from drilling. The leds flange wants to rest tight and flat against the underside of the anchor rail so it's important that each hole is free of burs. You may also use a Dremel tool for this procedure if available.
Step 3: Remove and discard the rubber grommet from the led shaft. This part is not needed to install the lights within the frame.

Go to: Page 1 I Page 2 I Page 3 I Page 4

Return to Installation Guide - Main Menu


Advanced Aluminum Railings & Design Inc., www.dekrail.ca
Tel: 604-291-6024 or Toll Free: 1-888-DEK-RAIL (335-7245) Fax: 604-291-6052
B3-5279 Still Creek Avenue, Burnaby, British Columbia, Canada, V5C 5V1